6Neron E,Baptiste P,Gupta J N D.Solving hybrid flow shop problem using energetic reasoning and global operations[J].Omega,2001,29(6):501-511.
7Tang L,Liu J,Rong A,et al.A review of planning and scheduling systems and methods for integrated steel production [J].European Journal of Operational Research, 2001,133( 1 ) : 1-20.
9Tang L,Liu J,Rong A,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operational Research, 2000,120(2) : 423-435.
10Santos C A,Spim J A,Gareia A.Mathematieal modeling and optimization strategies(genetic algorithm and knowledge base) applied to the continuous casting of steel[J].Engineering Application of Artificial Intelligence, 2003,16(8) :511-527.