期刊文献+

太焦高铁长治南站站前广场及配套附属设施建设项目设计方案研究 被引量:1

Study on Design Scheme of Station Square and Ancillary Facility Construction Project for Changzhi South Railway Station of Taiyuan-Jiaozuo High-speed Railway
下载PDF
导出
摘要 太焦高铁是中国高速铁路网"八纵八横"主通道中"呼南高铁"的重要组成部分,长治南站的开通将结束上党区不通高铁的历史。以太焦高铁长治南站站前广场及配套附属设施建设项目为例,论述在丘陵黄土地区,如何解决进出站旅客换乘、周边配套路网联通、山洪水排泄出路及广场景观亮化提升等问题。目前该工程正在建设,有关经验可供相关专业技术人员参考。 Taiyuan-Jiaozuo High-speed Railway is an important part of the Hohhot-Nanning High-speed Railway in the main"eight-vertical and eight-horizontal"channel of the high-speed railway network in China.The opening of Changzhi South Railway Station will end the history of no high-speed rail in Shangdang District.Taking the station square and ancillary facility construction project for Changzhi South Railway Station of Taiyuan-Jiaozuo High-speed Railway as an example,how to solve the problems of passenger transfer in and out of the station,the connection of the surrounding supporting road network,the discharge outlet of mountain flood discharge and the improvement of the square landscape lighting in the hilly loess area is discussed.The project is currently under construction,and the relevant experience can be used for reference by the relevant professional and technical personnel.
作者 王崇伟 李世晨 WANG Chongwei;LI Shichen(不详)
出处 《城市道桥与防洪》 2021年第2期200-205,M0018,共7页 Urban Roads Bridges & Flood Control
关键词 高铁站配套 丘陵黄土地区 总体设计 facilities for high-speed railway station hilly loess area overall design
  • 相关文献

参考文献1

共引文献5

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部