基于P6+BIM技术的超高层建筑施工进度管理方法 被引量:13

Construction Progress Management Method of Tall Buildings Based on P6+BIM Technology
下载PDF
导出
摘要 为解决超高层建筑因结构复杂、专业分包多、质量安全要求高导致工期难以控制的难题,分析并提出影响超高层建筑施工进度的主要因素及措施,通过创建建筑信息模型,采用P6+BIM技术进行项目进度管理,从技术和管理方面解决影响施工进度的主要难题,最终确保项目工期满足合同要求。 In order to solve the problem that the construction period of tall buildings is difficult to control due to its complex structure,many professional sub-contracting,high quality and safety requirements,a building information model is created. P6 + BIM technology is adopted to manage the project schedule.The main problems affecting the construction progress are solved from two aspects of technology and management,so as to ensure the construction period of the project meets the contract requirements.
作者 李松斌 林强 LI Songbin;LIN Qiang(The General Contracting Co.of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou,Guangdong 510290,China)
出处 《施工技术》 CAS 2020年第24期34-37,共4页 Construction Technology
关键词 高层建筑 建筑信息模型 钢结构 P6技术 进度管理 tall buildings building information modeling(BIM) steel structures P6 technology schedule management
  • 相关文献

参考文献6

二级参考文献34

共引文献111

同被引文献81

引证文献13

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部