期刊文献+

装配式混凝土结构高成本成因分析 被引量:12

Cause Analysis of High Cost of Prefabricated Concrete Structure
下载PDF
导出
摘要 通过多个实际工程的造价数据统计分析,对照传统现浇建造,探讨地方政策、现行设计规范或标准、预制构件制作、存放和运输及现场施工等影响因素,剖析导致装配式混凝土建造高成本主要成因,并结合实际工程经验提出相关建议,以期合理降低可压缩的成本增量。 Through statistics analysis of cost data of several actual projects,this paper discusses the influences of local policies,current design codes or standards,prefabricated component production,storage and transportation of prefabricated components,and site construction,and analyzes the main causes of high cost of prefabricated concrete construction.Finally,puts forward some suggestions based on the practical engineering experience,in order to reduce the compressible cost increment.
作者 肖光朋 项健 郭丹丹 XIAO Guangpeng;XIANG Jian;GUO Dandan(School of Civil Engineering,Architecture and Environment,Xihua University,Chengdu 610039,China)
出处 《建筑经济》 北大核心 2021年第2期68-70,共3页 Construction Economy
关键词 装配式混凝土建筑 传统现浇建造 成本增量 prefabricated concrete building traditional cast-in-place construction cost increment
  • 相关文献

参考文献3

二级参考文献9

共引文献47

同被引文献75

引证文献12

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部