摘要
峡江水利枢纽工程是一项大型水利枢纽工程,工程投资规模大,项目涉及范围广,涵盖建设内容多,工程技术复杂,建设要求高,建设工期长。建设过程中,破土动工的大量土建工程,现场环境和生态遭到短期破坏。为努力将环境和生态破坏的影响降到最小程度,建设单位将项目建设目标提升到生态工程高度,始终高度重视,积极采取加强环境保护、水土保持、水生态维护、抬田再造耕地等有力有效的生态工程措施,严格实行“三同时”制度,破坏的环境和生态条件得以及时恢复、全面恢复,尽快实现了工程生态文明建设目标,创造了良好的工程形象面貌,形成了可复制可推广的经验,可供类似工程借鉴。
The scale of investment on Xiajiang Hydro-junction project is big,the scope of project is vast,the cov-erage of construction content is rich,engineering technique is complex,construction requirement is demanding and construction period is long.In order to minimize the impact of environmental and ecological damage,the construction unit has raised the project construction goal to the height of ecological engineering,always at-tached great importance to it,actively took effective ecological engineering measures such as enhance envi-ronment protection,soil and water conservation,water ecological maintenance and lifting farmland to reclaim farmland.By strictly implementing the"three s imulators"s ystem,the damaged environmental and ecological conditions have been restored in a timely and comprehensive manner,and the ecologi-cal civilization of the project has been achieved as soon as possible,creating a good image of the project,formed a reproducible and popularized experience,which can be used for reference by similar projects.
作者
周贱军
李小娟
朱爱如
ZHOU Jianjun;LI Xiaojuan;ZHU Airu(Jiangxi Xingan Ganjiang River Embankment Authority,Xingan,Jiangxi Province,331300 China;Jiangxi Xingan Huangnibu Reservoir Authority,Xingan,Jiangxi Province,331300 China;Jiangxi Xiajiang Water Conservancy Project Authority,Nanchang,Jiangxi Province,330046 China)
出处
《科技创新导报》
2020年第32期23-25,共3页
Science and Technology Innovation Herald
关键词
生态文明
措施
经验
峡江水利枢纽
Eco-civilization
Measures
Experience
Xiajiang hydro-junction project