期刊文献+

高海拔特重冰峻岭地区输电线路结构创新措施综述

Study on Structure Innovation Measures for Transmission Line in Steep Mountains with High Altitude and Heavy Icing
下载PDF
导出
摘要 针对高海拔、特重冰、峻岭地区输电线路导地线荷载大、地形陡峭、铁塔根开大、铁塔级差有限、基础工程量大、常规施工方法效率低等特殊问题,结合工程设计经验,从全过程经济性、可靠性、可行性以及环保性综合考虑,提出了送电结构专业的创新措施,包括3种钢架延长腿、三类新型铁塔、两种新型基础方案。 Aimed at steep mountains with high altitude and heavy icing,the transmission line has some special problems,such as heavy load of earth wire,steep terrain,large size of tower,lack of tower legs,large amount of foundation project quantity and low efficiency of conventional construction methods.Combined with the rich experiences in engineering design,and from the comprehensive consideration of economy,reliability,feasibility and environmental protection in the full cycle,the structure innovation measures of transmission line are put forward,including three kinds of steel to extend the leg,three kinds of new tower type and two kinds of new foundation type.
作者 辜良雨 蒋锐 甘运良 翟洪利 陈俊帆 王伸富 王波 Gu Liangyu;Jiang Rui;Gan Yunliang;Zhai Hongli;Chen Junfan;Wang Shenfu;Wang Bo(CPECC Southwest Electric Power Design Institute Co., Ltd.,Chengdu 610021,Sichuan, China;EHV Power Transmission Company of China Southern Power Grid Co., Ltd., Guangzhou 510663, Guangdong, China)
出处 《四川电力技术》 2021年第1期9-13,69,共6页 Sichuan Electric Power Technology
关键词 高海拔 特重冰 峻岭 输电线路 铁塔 基础 high altitude heavy icing steep mountains transmission line tower foundation
  • 相关文献

参考文献2

二级参考文献7

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部