顶管作为一项新型的施工工艺,已经在管道施工中广泛使用,对于穿越河道管道施工,泥水平衡顶管相较于传统施工工艺优势明显。丰县东城路改造工程,过河污水管道采用泥水平衡顶管机施工,高效、快速地完成了施工任务,在保证了施工质量的同时,安全、环保方面较常规施工方法有了很大提高。
Pipe jacking has been widely used in pipeline construction as a new construction technology.Sludger balanced pipe jacking has obvious advantages compared with the traditional construction technology for pipeline construction across the river.The sludge balanced pipe jacking machine is used to construct the sewage pipeline across the river in the reconstruction project of Dongcheng Road in Fengxian County,the construction task is finished efficiently and quickly,the construction quality is ensured,the safety and environmental protection are greatly improved compared with the conventional construction methods at the same time.