摘要
目前桩基础被广泛使用,为获得高回填多雨区混凝土桩基较好的抗冲刷能力,以贵阳龙洞堡机场项目为依托,采用室内试验、模型模拟等方式,从桩基混凝土自身配合比方面开展研究,通过添加絮凝剂、硅灰、超缓凝剂等外加剂,成功研究了一种适应超长桩混凝土浇筑工艺要求、满足该复杂地层抗水流冲刷的混凝土。该混凝土的研制,能够有效提高该复杂地层桩基施工的安全和质量。
At present,pile foundation is widely used.In order to obtain better anti scour ability of concrete pile foundation in high backfill and rainy area,based on Guiyang Longdongbao airport project,this paper studies the mixing ratio of pile foundation concrete by means of indoor test and model simulation.By adding flocculant,silica fume,super retarder and other admixtures,it has successfully researched and designed a kind of concrete which suit for the requirement of concrete casting and the ability of anti current scour in complex stratum.The research of the concrete can effectively improve the safety and quality of pile foundation construction in this complex stratum.
作者
刘军安
杨大勇
乐俊
杨慧齐
宋江文
李玉才
杨浩
LIU Junan;YANG Dayong;LE Jun;YANG Huiqi;SONG Jiangwen;LI Yucai;YANG Hao(CCTEB Infrastructure Construction Investment Co.,Ltd,Wuhan,Hubei 430064,China)
出处
《施工技术》
CAS
2021年第1期76-79,共4页
Construction Technology
基金
中建三局科研课题:多雨区复杂地质条件下超长桩施工关键技术研究(CSCEC3B-2020-02)。
关键词
桩基础
水流冲刷
超厚回填土
混凝土
配合比
絮凝剂
piles
current scour
ultra-thick backfill soil
concrete
mixing ratio
flocculant