摘要 通过对博萨索机场现场水文地形进行勘察,对所得数据及原有设计进行统计分析,经过科学验算,在满足机场系统排水功能的前提下,结合当地施工实际情况,取消原设计的涵洞、浆砌排水沟变更为设立拦水坝排水方案,既节约成本又加快施工进度。 This paper conducts a survey of the hydrological topography of the Bosasso airport site, performs a statistical analysis of the obtained data and the original design, and after scientific calculations, on the premise of meeting the drainage function of the airport system,combined with the actual conditions of the local construction, the original design is cancelled culverts and mortar drainage ditches are changed to a dam drainage plan, which saves costs and speeds up the construction progress.
作者 陈武林 黄辉华 CHEN Wu-lin;HUANG Hui-hua(China Civil Engineering Construction Corporation,Bejing 100038,China)
出处 《工程建设与设计》 2021年第2期58-60,共3页 Construction & Design for Engineering
关键词 勘察 分析 计算 设计 变更 survey analysis calculation design change
  • 相关文献

参考文献1

二级参考文献4

  • 1TB10017-99.铁路工程水文勘测设计规范[S].[S].,..
  • 2铁道部第三勘察设计院主编.桥渡水文[M].北京:中国铁道出版社,1993.
  • 3辽宁省水利设计总院,辽宁省水资源勘测总站.辽宁省中小河流设计暴雨洪水计算方法[M].沈阳:辽宁出版社,1998.
  • 4铁道部第三勘察设计院,铁科院西南研究所.小流域暴雨洪水计算-推理单位线法[Z].1985.

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部