摘要
引江济淮工程H003-1标泵站位于安徽省内的最后一级提水泵站,对引江济淮工程最终通水具有重大意义。论文结合H003-1标泵站底板大体积混凝土施工过程,针对其温度控制进行研究。
The H003-1 standard pump station of the Diversion Project from the Yangtze River to the Huaihe River is located at the last level of the pump station in Anhui Province. Combined with the construction process of mass concrete on the floor of H003-1 standard pump station, the temperature control is studied in this paper.
作者
陈永刚
李成春
赵月
CHEN Yong-gang;LI Cheng-chun;ZHAO Yue(Power China STECOL Corporation,Tianjin 300000 China)
出处
《工程建设与设计》
2021年第2期204-205,共2页
Construction & Design for Engineering
关键词
大体积混凝土
温控
裂缝
mass concrete
temperature control
cracks