期刊文献+

地铁车站深基坑地连墙质量问题及处理措施

Quality Problems and Treatment Measures of Diaphragm Wall in Deep Foundation Pit of Subway Station
下载PDF
导出
摘要 地铁车站深基坑地连墙的质量在很大程度上可以决定着地铁系统以及城市建设能否顺利实施。然而,在地铁车站深基坑地连墙施工中,会受到很多因素的影响,导致存在很多质量问题,也对地铁系统的正常运行造成了非常大的影响,进而给人们的日常生活以及工作带来不便。论文主要对地铁车站深基坑地连墙的质量问题及处理措施进行简单的介绍,希望可以给大家一些启发。 The quality of deep foundation pit connecting wall in subway station can decide whether subway system and urban construction can be carried out smoothly to a great extent.However,in the construction of deep foundation pit and connecting wall of subway station,it will be affected by many factors,leading to many quality problems,which will also have a great impact on the normal operation of subway system,and bring inconvenience to People’s Daily life and work.This paper mainly introduces the quality problem of deep foundation pit connecting wall of subway station and its treatment measures,hoping to give us some inspirations.
作者 施长风 SHI Chang-feng(Zhejiang Zicheng Project Management Co.Ltd.Jiaxing 314000,China)
出处 《工程建设与设计》 2021年第2期257-258,共2页 Construction & Design for Engineering
关键词 深基坑 地连墙 措施 deep foundation pit ground connecting wall measures

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部