摘要
为提高桩基工程的施工效率,控制施工周期,降低施工成本,以某工程项目为例,分析了BIM技术在桩基工程中的应用。桩基施工阶段,通过三维模型进行现场布设,桩基跟踪质量管控,实施施工质量管理和资料管理,可以动态化地对施工进程进行调整,保障施工质量。
In order to improve construction efficiency pile foundation project,control construction cycle and reduce construction cost,and through taking engineering project as an example,the research analyzes the application of BIM technology in pile foundation project.In file foundation construction stage,it is suggested to make site layout in 3D model,track quality control in pile foundation,implement construction quality and material management,adjust construction process dynamically,and safeguard construction quality.
作者
韦永丽
Wei Yongli(Liuzhou City Vocational College, Liuzhou 545002, China)
出处
《黑龙江科学》
2021年第4期102-103,共2页
Heilongjiang Science
基金
基于三维虚拟模型下的“建筑工程定额与预算”的教学方法研究(2018B03)。
关键词
BIM技术
桩基工程
BIM technology
Pile foundation project