摘要 张北柔性直流电网工程采用真双极接线,在单极故障后,非故障极转带故障极部分或全部损失的功率时,可能造成功率盈余问题。经比较后,推荐在送端换流站装设交流耗能装置,通过投入交流耗能装置消耗盈余功率,使非故障极正常工作,再有序切除风机,确保孤岛方式下的交流侧电网平衡,保障柔直电网的安全稳定运行。 This paper points out that Zhangbei Flexible DC grid project with true bipolar wiring,when happens a unipolar fault,part or all lost power will turn to the non-faulty poles,may cause power surplus problems.After comparison,recommends AC chopper installing at the converter stations.AC chopper is used to consume the surplus power to make the non-faulty poles work normally,and then the fans are removed in an orderly manner to ensure the balance of the AC-side power grid in the island mode,and guarantee the safety for Flexible DC grid.
作者 彭花娜 周杨 梅念 代妍妍 方乙君 PENG Hua-na;ZHOU Yang;MEI Nian;DAI Yan-yan;FANG Yi-jun(PowerChina Fujian Electric Power Engineering Co.,Ltd.,Fuzhou 350003,China;State Grid Corporation of China,Beijing 100031,China;State Grid Economic and Technological Research Institute Co.,Ltd.,Beijing 102209,China)
出处 《电力勘测设计》 2021年第2期68-73,78,共7页 Electric Power Survey & Design
关键词 新能源送出 功率盈余 直流耗能装置 交流耗能装置 new energy transmission power surplus DC chopper AC chopper
  • 相关文献

参考文献4

二级参考文献60

共引文献205

同被引文献36

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部