摘要
通过创新方法,优化工程布局,解决露天铜矿防洪度汛期间清淤难题,为清淤工程实施创造条件。对于汇水较大的区域控制水流走向,提前对水沟进行改道,避免水流源源不断的汇入水仓。清淤过程中,采用“先进操作法”,以达到高效生产的目的。
By means of innovative methods,the project layout is optimized to solve the problem of dredging during flood control and flood control for open-pit copper mine,and create conditions for dredging project implementation.For large catchment areas to control the flow direction,in advance of the ditch to divert water,to avoid the continuous inflow of water into the silo.In the process of dredging,"advanced operation method"is adopted to achieve the purpose of efficient production.
作者
祝志强
ZHU Zhi-qiang(Chengmenshan Copper Mine of Jiangxi Copper Co.,Ltd,Jiujiang 332100,China)
出处
《世界有色金属》
2020年第23期33-34,共2页
World Nonferrous Metals
关键词
工程布局
露天铜矿
防洪度汛
清淤工程
先进操作法
engineering layout
Open pit copper mine
Flood control and flood control
Dredging project
Advanced operation method