浅谈解决某露天铜矿山采坑清淤难题 被引量:1

To solve the problem of dredging in an open-pit copper mine
下载PDF
导出
摘要 通过创新方法,优化工程布局,解决露天铜矿防洪度汛期间清淤难题,为清淤工程实施创造条件。对于汇水较大的区域控制水流走向,提前对水沟进行改道,避免水流源源不断的汇入水仓。清淤过程中,采用“先进操作法”,以达到高效生产的目的。 By means of innovative methods,the project layout is optimized to solve the problem of dredging during flood control and flood control for open-pit copper mine,and create conditions for dredging project implementation.For large catchment areas to control the flow direction,in advance of the ditch to divert water,to avoid the continuous inflow of water into the silo.In the process of dredging,"advanced operation method"is adopted to achieve the purpose of efficient production.
作者 祝志强 ZHU Zhi-qiang(Chengmenshan Copper Mine of Jiangxi Copper Co.,Ltd,Jiujiang 332100,China)
出处 《世界有色金属》 2020年第23期33-34,共2页 World Nonferrous Metals
关键词 工程布局 露天铜矿 防洪度汛 清淤工程 先进操作法 engineering layout Open pit copper mine Flood control and flood control Dredging project Advanced operation method
  • 相关文献

参考文献3

二级参考文献21

共引文献19

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部