期刊文献+

露天矿外部沟沟道深度优化

Study on depth optimization of external trench in open-pit mine
下载PDF
导出
摘要 为了优化露天矿运输系统缩短运距,对外部沟沟道深度进行详细研究;分析了外部沟的特点及影响外部沟设置的因素;通过研究外部沟沟道设置的位置,以及采剥工程量运距、外部沟掘沟工程量与外部沟沟道深度之间的关系,运用费用补偿法建立数学模型,确定经济合理的外部沟沟道深度。以神华宝日希勒能源有限公司露天煤矿为例,确定外部沟道设置在不同位置时的外部沟沟道最佳深度,经济效益显著。 In order to optimize the transportation system of open-pit mine and shorten the transportation distance,we study on the depth of external trench.This article analyzes the characteristics of the external ditch and the factors affecting the setting of the external ditch.By studying the location of the external trench,the relationship between the mining distance of the stripping works,the excavation volume and the depth of the external trench,the article establishes mathematical model by using the cost compensation method to determine the economically reasonable depth of the external trench.Taking the open-pit coal mine of Shenhua Baorixile Energy Company as an example,the optimal depth of the external trench is determined when the external channel is set at different positions,and the economic benefit is remarkable.
作者 张周爱 鞠兴军 李雁飞 黄玉凯 ZHANG Zhouai;JU Xingjun;LI Yanfei;HUANG Yukai(Shenhua Baorixile Energy Co.,Ltd.,Hulunbuir 021500,China)
出处 《露天采矿技术》 CAS 2021年第1期1-4,共4页 Opencast Mining Technology
关键词 露天矿 外部沟 内部沟 移动坑线 固定坑线 沟道深度 open-pit mine external trench internal trench mobile pit line fixed pit line trench depth
  • 相关文献

参考文献7

二级参考文献28

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部