露天矿山出入沟与卡车的数量匹配关系探讨

Discussion on matching relationship between main access and the number of trucks in open-pit mine
下载PDF
导出
摘要 巴基斯坦塔尔煤矿项目在基建剥离和生产运维阶段中出现了运输效率较低的情况,为了保证现场的运输能力,发挥车辆的运输效率,释放矿山生产能力,通过探讨测定矿山道路的基本参数,对矿山卡车的运输能力、矿山道路的通行能力进行分析。 Thar Coal Mine project in Pakistan has a low transportation efficiency during the phase of infrastructure stripping and production operation and maintenance.In order to ensure the on-site transportation capacity,give full play to the transportation efficiency of trucks,and release the mine's production capacity,this article discusses the determination of mine roads some basic parameters,and analyzes the transportation capacity of mine trucks and the traffic capacity of mine roads.
作者 周浩浩 胡召响 胡桂英 ZHOU Haohao;HU Zhaoxiang;HU Guiying(Guangdong Hongda Blasting Engineering Co.,Ltd.,Guangzhou 510623,China)
出处 《露天采矿技术》 CAS 2021年第1期13-16,21,共5页 Opencast Mining Technology
关键词 运输效率 阻力系数 出入沟 通行能力 卡车匹配 transportation efficiency drag coefficient main access traffic capacity truck match
  • 相关文献

参考文献5

二级参考文献7

共引文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部