摘要
本文阐述了船舶开展先行工法设计的条件与时机,以某船厂成功建造的挖泥船、集装箱船等产品在船舶详细设计与生产设计衔接过程中发现的问题,结合详细设计数据和具体工法优化设计案例,通过对比得出船厂开展先行工法设计有利于船舶建造精度控制、简化生产流程、提高产品完整性;并提供了船舶设计与建造工艺、工法设计有机结合的前瞻性方法参考;同时,对开展先行工法设计的局限性及解决办法进行讨论。
This paper states the conditions and timing of advance technical design.Taking the problems found in the connection between ship detailed design and production design of dredgers,container ships and other products successfully built by a shipyard as an example,combined with the detailed design data and the specific technique optimization design case,it is concluded that the shipyard's carrying out the advance technical design is beneficial to the precision control of ship construction,the simplification of production process and the improvement of product integrity,and provides a forward-looking method reference for the organic combination of ship design and construction technical design;at the same time,the limitation and solution of the advance technical design are discussed.
作者
陈锌
黄华锋
CHEN Xin;HUANG Huafeng(COSCO Shipping Heavy Industry(Guangdong)Co.,Ltd.,Dongguan 523146;CSSC Huangpu wenchong shipbuilding Co.,Ltd.,Guangzhou 510715)
出处
《广东造船》
2021年第1期54-57,共4页
Guangdong shipbuilding
关键词
工法设计
详细设计
生产设计
Shipbuilding technical design
Detailed design
Production design