期刊文献+

浅谈续建尾矿库需注意的问题

Discussion on Problems Needing Attention to Continued-built Tailings Reservoir
下载PDF
导出
摘要 通过分析续建尾矿库与新建尾矿库的区别,阐述续建尾矿库需关注新老尾矿库的衔接问题,包括续建尾矿库的建设规划、尾矿处置规模过渡方案、选厂用水过渡方案、现有尾矿设施的利旧方案和尾矿设施运行经验借鉴,并以某铜矿矿山的续建尾矿库工程为例,说明实际工作中如何根据实际工程情况解决上述问题。 By analyzing the difference between the continued-built tailings reservoir and the newly-built tailings reservoir,it was expounded that the transition from the old tailings reservoir to the continued-built tailings reservoir should be paid attention to in the construction of the continued-built tailings reservoir,including the construction planning of the continued-built tailings reservoir,the transition scheme of the tailings disposal scale,the transition scheme of the water consumption in the plant,the utilization of the existing tailings facilities and the operation experience of the tailings facilities.Taking the continued-built tailings reservoir project of a copper mine as an example,it was showed how to solve the above problems in practical work according to the actual situation.
作者 胡祥群 袁朝 杨利平 HU Xiang-qun;YUAN Chao;YANG Li-ping
出处 《有色冶金节能》 2021年第1期71-74,共4页 Energy Saving of Nonferrous Metallurgy
关键词 新建尾矿库 续建尾矿库 衔接 尾矿规模 利旧 经验借鉴 newly-built tailings reservoir continued-built tailings reservoir transition tailings scale utilization of old facilities experience reference
  • 相关文献

参考文献2

二级参考文献12

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部