期刊文献+

Research and comprehensive evaluation on delivery schemes of the Grand Inga hydropower station 被引量:1

下载PDF
导出
摘要 Congo River has abundant hydropower resources,and large-scale cascade power stations,such as the Grand Inga,can be constructed in downstream locations.However,the fragile economic foundations of the Democratic Republic of the Congo and neighbor!ng Central African countries,and the small-scale regional power consumption market prohibit the implementation of large-scale hydro power projects.As the high-voltage,I on g-dista nee power transmission tech no logy matures,hydropower from the Grand Inga can be delivered to load centers in other regions of Africa.This study establishes a 6 dime nsional comprehe nsive assessment model using the best-worst method to evaluate large-scale,I on g-distance,cross-border power intercon necti on projects.The model is applied to evaluate all the can didate in ter-regional power delivery schemes of the Inga III hydropower station,and the evaluation results can effectively help investment institutions and policy makers in policy making and potential market targeting.
出处 《Global Energy Interconnection》 CAS 2020年第6期521-531,共11页 全球能源互联网(英文版)
基金 National Key Reaearch and Development Program of China(2016YFB0900400).
  • 相关文献

参考文献3

二级参考文献11

共引文献16

同被引文献17

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部