期刊文献+

缅甸某燃机电厂总图布置过程分析与优化

Process Analysis and Optimization on the General Layout of a Gas Turbine Power Plant in Myanmar
下载PDF
导出
摘要 随着国家“一带一路”倡议的持续发力,我国与周边国家合作交流日益广泛。中国也将能源建设目光转投国外,在竞争日益激烈的电力建设行业中抓住机遇,开拓市场,为企业发展注入新的生机与活力。文章依托缅甸某燃机电厂项目,提出过程分析模型,针对总图布置过程中遇到的问题,深入剖析,合理决策,不断优化总平面布置方案,旨在提高企业综合效益。 With the continuous efforts of the strategy of"one belt and one road",China's cooperation with neighboring countries has becoming increasingly extensive.China energy engineering group also turns attention to foreign countries,seizing opportunities in the increasingly competitive power construction industry,opening up markets,and injecting new vitality into the development of enterprises.Based on a gas turbine power plant project in Myanmar,this paper puts forward a process analysis model.According to the problems encountered in the process of general layout,it analyzes in-depth,makes reasonable decisions,constantly optimizes the general layout p lan,and improves the comprehensive benefits of the enterprise.
作者 李峰 Li Feng(China Energy Engineering Group Hunan Electric Power Design Institute Co.,Ltd.,changsha,Hunan 410007)
出处 《工程技术研究》 2020年第22期208-210,共3页 Engineering and Technological Research
关键词 总图布置 平面方案 燃机电厂 general layout plan plot gas turbine plant process analysis
  • 相关文献

参考文献4

二级参考文献4

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部