摘要 某核电厂机组在满功率稳定运行期间,主给水调节阀的开度持续增大,如果该趋势不能控制,机组存在降功率或更严重的风险。经故障分析及现场解体检查,最终确定主给水调节阀的开度持续增大是由于阀笼堵塞导致。本文通过结合该阀阀笼特点,分析出导致阀笼堵塞的原因,根据现场实际制定出处理方法,为主给水调节阀的调试和运行以及给水系统的异物控制给出建议。 During full power operation in a nuclear power plant,the opening of the main feedwater control vlave keeps increasing.It will bring reducing power or more serious risks to the nuclear power plant if the increasing trend cannot be controlled.After fault analysis and site disassembly inspection,it is valve cage blockage which cause the opening of feed-water control valve keeps increasing.The reasons which cause the valve cage blockage have been discovered and the corresponding treating methods have also been established by combining the characteristics of the valve cage and field practice.In addition,some suggestions for the startup and operation of feed-water control valve as well as foreign matter control for water supply system are provided.
作者 蒋浩然 陶建 葛宝英 马伟 JIANG Hao-ran;TAO Jian;GE Bao-ying;MA Wei(The Commissioning Center,Shanghai Nuclear Engineering Reserch&Design Institute,Shanghai 201100,China)
出处 《中国核电》 2021年第1期110-113,共4页 China Nuclear Power
关键词 核电厂 主给水调节阀 满功率运行 开度持续增大 nuclear power plant feed-water control valve full power operation opening keeps increasing
  • 相关文献

参考文献4

二级参考文献8

  • 1戴立操,张力,黄曙东.核电厂HRA定性评价及应用[J].工业工程与管理,2005,10(1):17-20. 被引量:2
  • 2Wilmart P,Grant A.Nuclear Energy Agency.Critical Operator Actions:Human Reliability Modeling and Data Issues[R].France,Issy-les-Moulineaux:OECD Nuclear Energy Agency,1998.
  • 3Swain A D,Guttmann H E.Handbook of human reliability analysis with emphasis on nuclear power plant applications[R].NUREG/CR-1278.Albuquerque:Sandia National Laboratories,1983.
  • 4Human Reliability Analysis in Probabilistic Safety Assessment for Nuclear Power Plants[R].A Safety Practice,Safety Series No.50-P-10,Vienna:INTERNATIONAL ATOMIC ENERGY AGENCY.,1995.
  • 5Hannaman G W.Human Cognitive Reliability Model for PRA Analysis[R].American:EPRI,1984.
  • 6濮继龙.大亚湾核电厂运行教程[M]北京:原子能出版社,1999:555 -633.
  • 7中华人民共和国国家发展和改革委员会.DL/T 996 - 2 0 0 6 火力发电厂汽轮机电液控制系统技术条件[S]. 2006:13 -15.
  • 8黄曙东,张力.THERP+HCR分析方法时间接口研究[J].人类工效学,2002,8(1):5-7. 被引量:6