摘要
在主变压器零序电流保护的设计和出口方式整定中,应充分考虑特殊主接线方式和实际运行方式下的差异,决不能生搬硬套,简单的依据主变零序保护动作后先切除不接地的变压器,再切除接地变压器的原则显然是不合理的;应对主变零序保护动作结果进行分析,合理选择保护装置的跳闸方式或跳闸点,有效地避免发电厂事故扩大化。
Based on the practical example of Gaobazhou Hydropower Plant,the design and setting of the zero sequence protection for main transformers are discussed.Considering the specific connection mode and the practical operation conditions of the transformers,the ordinary operation principle that cutting off the ungrounded transformers first and then the grounded ones simply according to the zero sequence protection action is inappropriate.Instead,the tripping mode or the tripping point of the protection equipment should be selected carefully based on the analysis of the results of the zero sequence protection action,so that the accident can be effectively controlled.
作者
张国超
许重庆
刘春
ZHANG Guochao;XU Chongqing;LIU Chun(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
出处
《水电与新能源》
2021年第2期11-14,共4页
Hydropower and New Energy
关键词
变压器
零序保护
跳闸
transformer
zero sequence protection
tripping