摘要
国家环保治理政策的执行日益严格,多地地材价格明显上升,但铁路工程按照相关政策对地材价差不予调整,各施工单位在承接铁路工程项目时承担了巨大风险。铁路建设项目地材是否有必要进行调差,地材价差的计算、价差分担、合同签订以及验工计价等工作如何开展,均成为困惑建设单位以及施工单位的问题。本文就某铁路建设项目开工以来一直探索的地材调差问题进行探讨,为寻求解决同类问题的同行提供参考。
The implementation of the national environmental protection policy is becoming more and more strict,and the price of floor materials in many places has risen significantly.However,the price difference of floor materials is not adjusted in accordance with relevant policies in railway projects.Each construction unit bears huge risks when undertaking railway projects.Whether it is necessary to adjust the ground material of railway construction projects,how to carry out the calculation of the ground material price difference,the price difference burden,the signing of the contract,and the valuation of the work have all become problems that puzzle the construction unit and the construction unit.This article discusses the problem of floor material adjustment that has been explored since the start of a railway construction project,and provides references for colleagues seeking to solve similar problems.
作者
郑莹子
ZHENG Ying-zi(Southern Sichuan Intercity Railway Co.,Ltd.,Zigong 643000,China)
出处
《价值工程》
2021年第2期79-80,共2页
Value Engineering
关键词
铁路建设项目
地材调差
必要性
计算方法
railway construction project
floor material adjustment
necessity
calculation method