摘要
针对传统电力自动化主站的可视化调度方法存在可靠性较低的问题,文章提出电力自动化主站的可视化调度方法。通过提取可视化技术特征、监测电力自动化主站配网负载和搭建电力自动化主站的可视化调度平台三种方式,完成电力自动化主站的可视化调度方法的设计。将三种传统调度方法与文中调度方法的可靠性进行实验对比,结果表明,文中调度方法比传统调度方法的可靠性更高,证明设计方法的可靠性更高。
The traditional visual dispatching method of power automation master station has the problem of low reliability.A visual dispatching method of power automation master station is proposed.The design of visual dispatching method of power automation master station is completed by three ways:extracting visual technical features,monitoring distribution network load of power automation master station and building visual dispatching platform of power automation master station.The three traditional scheduling methods are compared with the reliability of the scheduling method in this paper.The experimental results show that the reliability of the scheduling method is higher than that of the traditional scheduling method,which proves the reliability of the design method is higher.
作者
石培钊
SHI Peizhao(Chengxi Power Supply Branch of State Grid Tianjin Electric Power Company,Tianjin 300190,China)
出处
《现代信息科技》
2020年第22期152-154,共3页
Modern Information Technology
关键词
可视化技术
调度方法
电网
电力自动化主站
visualization technology
dispatching method
power grid
power automation master station