高陡坡人工挖孔桩孔口绑扎钢筋笼技术 被引量:1

Technology of Binding Reinforcement Cage at Opening of Manual Excavated Pile on High Steep Slope
下载PDF
导出
摘要 主要针对云南省地貌,两岸陡峭的V形山谷,进行桥梁桩基施工。无工作平台,施工便道工程量大,钻机、挖掘机等大型施工设备无法就位等问题导致桩基仅能选用人工挖孔桩。人工挖孔桩不具备钢筋笼直接吊装的桩基,采用孔口绑扎技术的具体施工方法及工艺。 This article mainly focuses on the topography of Yunnan Province and the steep V-shaped valleys on both sides of the bridge pile foundation construction.There is no working platform,a large amount of construction access,and large construction equipment such as drilling rigs and excavators cannot be placed in place.As a result,only manual digging piles can be used for pile foundations.The manual digging pile does not have the pile foundation directly hoisted by the steel cage,and adopts the specific construction method and technology of the hole binding technology.
作者 于振海 Yu Zhen-hai
出处 《建筑技术开发》 2021年第2期51-52,共2页 Building Technology Development
关键词 人工挖孔桩 孔口绑扎 钢筋笼 manual digging pile hole binding steel cage
  • 相关文献

参考文献2

二级参考文献6

  • 1[2]JGJ18-96,钢筋焊接及验收规程[S].
  • 2GB50300-2001.建筑工程施工质量验收统一标准.[S].,..
  • 3JGJ94-94 建筑桩基技术规程
  • 4JTJ 041-2000.公路桥涵施工技术规范[S],2000.
  • 5JTG D60-2004.公路桥涵设计通用规范[S],2004.
  • 6JTG D62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S],2004.

共引文献2

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部