摘要
依据师大花溪校区4号学生生活区3号楼工程的现场实际项目的施工方法研究,总结相关传统施工工艺带来的困难,结合施工经验,对高回填、强溶岩区桩基础的基本技术要求和处理办法进行系统研究与总结。
By studying the construction method of the real projects,this paper summarizes all kinds of difficulties from the traditional construction technology and combines it with the author s years of construction experience,with the aim of studying and summerizing in a systematic way the basic technical demands and solutions for the pile foundation in high backfill and strongly soluble rock regions.
作者
任培娥
齐波
Ren Pei-e;Qi Bo
出处
《建筑技术开发》
2021年第2期152-153,共2页
Building Technology Development
关键词
高回填
强溶岩
桩基础
施工
high backfill
strongly soluble rocks
pile foundation
construction