摘要
隧道作为控制公路工程的重要咽喉节点,直接影响着公路全线的通行效率和安全性。本文以某高速公路隧道衬砌病害处治施工项目为案例,通过阐述置换法的施工工艺和工程经济性指标,分析了隧道置换法在围岩衬砌病害处治中的实际效果。
As an important throat node for controlling highway engineering,tunnels directly affect the efficiency and safety of the entire highway route.Taking the highway tunnel lining disease treatment construction project as a case,this paper expounds the construction technology and engineering economic index of the replacement method,and analyzes the actual effect of the tunnel replacement method in the treatment of surrounding rock lining disease.
作者
刘帆
Liu Fan(Hunan Shangshang Municipal Construction and Development Co.,Ltd.,Changsha 410000)
出处
《中阿科技论坛(中英文)》
2021年第2期29-32,共4页
China-Arab States Science and Technology Forum
关键词
隧道工程
不良地质
置换法
经济效益
Tunnel engineering
Poor geology
Replacement
Economic benefit