以南京某新建三塔连体超高层城市综合体项目为背景,对其塔楼施工中的大型装备部署展开研究。从整体模架体系、塔吊、人货梯和混凝土泵送设施4个方面提出实施方案,经现场实践,取得了良好的效果。总结的经验可供类似工程借鉴。
Taking a new three tower connected super high-rise urban complex project in Nanjing as the background,the large-scale equipment deployment in the tower construction is studied.The implementation scheme is put forward from four aspects of integral formwork system,tower crane,personnel and material elevators and concrete pumping facilities,and good results are achieved through on-site practice.The summarized experience can be used as reference for similar projects.
作者
朱利君
ZHU Lijun(Shanghai Construction No.4 Group Co.,Ltd.,Shanghai 201103,China)
出处
《建筑施工》
2021年第2期248-251,共4页
Building Construction
关键词
超高层建筑
核心筒
整体模架
机械设施
super high-rise building
core tube
integral formwork
mechanical facility