期刊文献+

高寒区某拱坝首蓄期坝体渗透压力异常现象分析 被引量:3

Analysis on Anomalies of the Dam Osmotic Pressure of an Arch Dam during the Initial Storage Period in Alpine Region
下载PDF
导出
摘要 文章基于北疆高寒地区百米级某拱坝坝体渗压计监测资料,分析坝体渗透压力异常现象的原因,分析认为施工期温度控制措施是关键因素,可为高寒地区建设同类型拱坝提供参考。 Based on the piezometer monitoring data of a hundred-meter arch dam in northern Xinjiang,the article analyzes the causes of the abnormal osmotic pressure of the dam.The analysis indicates that temperature control measures during the construction period are the key factor,and the article provides reference for the construction of similar arch dams in alpine region.
作者 韩世栋 李新 HAN Shidong;LI Xin(Nari Group (State Grid Electric Power Research Institute) Co., Ltd., Nanjing 211000,China;Xinjiang Administrative Bureau of Construction of Irtysh River Basin Development Project, Urumqi 830000,China)
出处 《西北水电》 2021年第1期60-64,共5页 Northwest Hydropower
关键词 高寒区 拱坝 首蓄期 渗透压力 alpine region arch dam initial storage period osmotic pressure
  • 相关文献

参考文献7

二级参考文献3

共引文献10

同被引文献17

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部