期刊文献+

大峡谷隧道进口段施工通风方案设计 被引量:2

Design of Ventilation Scheme for Construction of the Entrance Section of the Grand Canyon Tunnel
下载PDF
导出
摘要 目前针对隧道施工通风已开展了较多研究,但是对于长距离公路而言,其施工规划受隧址区地质情况、工期等因素影响,因此其施工规划不尽相同。本文以大峡谷隧道为例,通过对不同区段地质情况的研讨和分析,综合考虑了现有通风设备以及现场施工情况,进行通风方式选择、施工工区划分,再进行风量计算、风阻计算、通风设备选型,形成一套完整的长大公路隧道通风设计方案。 At present,many researches have been carried out on tunnel construction ventilation,but for long-distance highways,the construction planning is affected by the geological conditions of the tunnel site,construction period and other factors,so the construction planning is not the same.This article takes the Grand Canyon Tunnel as an example.Through the study and analysis of the geological conditions of different sections,the existing ventilation equipment and site construction conditions are comprehensively considered,ventilation method selection,construction work area division,and air volume calculation,wind resistance calculation,and ventilation are carried out.Equipment selection,forming a complete set of ventilation design schemes for long and large highway tunnels.
作者 高梅 GAO Mei(Sichuan Chuanjiao Road and Bridge Co.,Ltd.,Guanghan Sichuan 618300,China)
出处 《交通节能与环保》 2021年第1期140-143,151,共5页 Transport Energy Conservation & Environmental Protection
关键词 隧道工程 长大隧道 施工通风 独头掘进 硬岩 设备确定 tunnel engineering long and large tunnels construction ventilation single-head tunneling hard rock equipment determination
  • 相关文献

参考文献9

二级参考文献497

共引文献672

同被引文献10

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部