摘要 随着城市用电负荷的增加,运行时间长、设备老旧的变电站已难以满足供电可靠性的要求。在变电站原场地不停电改造、消防新旧系统的并用、"微机五防"系统的变化和通道的隔离,这都是大型敞开式变电站主接线改造的重要难点。通过分析运行超30年的某220 kV变电站大型敞开式设备的改造方案,利用3个主变之间相互的负荷转移实现不停电改造,并增加220 kV出线和合理布置电缆沟的方式,解决了电源与变压器之间连接的问题,利用消防运行方式的灵活切换解决新旧消防设备的并用问题,"微机五防"系统220 kV侧接入带电显示器装置,有效地保证了设备检修过程中人员和设备的安全,安全通道采取硬隔离的方式杜绝安全隐患的发生。 With the increase of urban electric loads,substations with long operating and old equipment have been unable to meet the requirements of power supply reliability.The modification in the original site of the substation and without power failure,and the combined use of new and old fire protection systems,and the change of the"microcomputer five prevention"system and the isolation of the passage are major difficulties and safety factors for the modification of the large open main wiring of substations.This paper analyzes modification plan of the large open equipment in the 220 kV Songjiang substation,which has been in operation for over 30 years,and uses the mutual load transfer between the three main transformers to achieve non-stop electricity retrofitting.The problem of the connection between the power supply and the transformer is solved by adding 220 kV outlets and laying reasonable cable trenches.The flexible switching of the operation mode of the firefighting operation system is adopted to solve the joint use of new and old firefighting equipment.The 220 kV side of the"microcomputer five prevention"system is connected to a charged display device,which effectively ensures the equipment maintenance process safety of personnel and equipment.The safety passage adopts hard isolation to prevent the occurrence of safety hazards.
作者 茅伟杰 沈珉峰 荣富 徐璐 朱佩林 曹扣成 MAO Weijie;SHEN Minfeng;RONG Fu;XU Lu;ZHU Peilin;CAO Koucheng(State Grid Songjiang Power Supply Company,SMEPC,Shanghai 201600,China)
出处 《电力与能源》 2021年第1期68-72,共5页 Power & Energy
关键词 电力网 电力系统运行 220 kV变电站改造工程 power grid power system operation 220 kV substation renovation project
  • 相关文献

参考文献6

二级参考文献27

  • 1凌永标.面向配电网自动化建设的配网接线方式探讨[J].现代电力,2005,22(1):45-47. 被引量:26
  • 2姚莉娜,张军利,刘华,王征.城市中压配电网典型接线方式分析[J].电力自动化设备,2006,26(7):26-29. 被引量:52
  • 3忻国胜,王敏.220kV城市旧变电站的改建新思路[J].华东电力,2007,35(1):45-47. 被引量:5
  • 4张建东.电力系统微机继电保护新技术及自动化装置调试手册[M].北京:中国电力出版社,2006.
  • 5李文沅[加].电力系统风险评估:模型、方法和应用[M].北京:科学出版社,2006.
  • 6中华人民共和国能源部,建设部.城市电力网规划设计导则[S].北京:水利电力出版社,1993.
  • 7中华人民共和国电力部.DL/T599-1996城市中低压配电网改造技术导则[S].北京:中国电力出版社,1996.
  • 8重庆綦江220kV变电站增容改造初步设计报告.
  • 9重庆秀山220kV变电站增容改造初步设计报告.
  • 10重庆酉阳220kV变电站增容改造初步设计报告.