电除尘器F结构与GP结构对比分析 被引量:1

Comparative Analysis on F Structure and GP Structure of Electrostatic Precipitator
原文传递
导出
摘要 电除尘器是工业粉尘治理的主流设备,设备的型号和式样直接影响其投资。目前,钢铁冶炼的机头电除尘器市场上主要存在GP型和F型两大结构类型。分析比较了GP结构电除尘器的壳体宽大梁、双立柱、阴极系统的小框架、扁担梁等典型结构的特征和F结构电除尘器的壳体混合式梁、笼式阴极框架、套管式吊挂等典型结构的特征,剖析了各结构部件的优缺点,并得出在相同条件下,F型比GP型电除尘器质量低18%左右。 Electrostatic precipitator( ESP) is the main equipment of industrial dust control equipment and the structure of the equipment style directly affects its investment. At present,GP structure and F structure of ESP are two main structure types for iron and steel smelting dust control. The wide girder,double column,small frame,shoulder pole beam of GP structure and the hybrid beam,cage type cathode frame,extensiontype cathode hanging of F structure which are the characteristic features are analysed and compared. The advantages and disadvantages of each characteristic features are dissected. By comparing with some engineering examples,the weight of F structure is 18% lower than GP structure.
出处 《机电一体化》 2020年第6期45-52,共8页 Mechatronics
基金 国家重点研发计划(2017YFB0603200)。
关键词 电除尘器 粉尘治理 结构类型 投资费用 宽大梁 ESP dust removing structure type investment cost wide girder
  • 相关文献

参考文献4

二级参考文献16

  • 1郦建国,龙辉,郦祝海,等.低低温电除尘技术研究及应用[C]//第十五届中国电除尘学术会议论文集.2013.
  • 2YOSHIO Nakayama,SATOSHI Nakamura,YASUHIRO Takeuchi,et al.MHI high efficiency system-proven technology for mul.
  • 3MASAMI Kato,TADASHI Tanaka,YASUKI Nishimura,et al.Method and system for handling exhaust gas in a boiler:USA.
  • 4土屋喜重,川西好光,大西召一,等.Very cold electrostatic technology of advanced flue gas treatment system for co.
  • 5柳生隆志,土屋喜重,大西召一,等.Recent electrostatic precipitation technology[J].三菱重工技报,1996,33(1):69-73.
  • 6Development and demonstration of waste heat integration with solvent process for more efficient CO2 removal f.
  • 7柴田宪司,三重野光博,山本卓也.電気集麈方法[P].三菱重工技报.2000.
  • 8TOSHIAKI Misaka,YOSHIHIKO Mochizuki.Recent application and running cost of moving electrode type electrostati.
  • 9STEPHENL Francis,ANDREAS Back,PER Johansson.Reduction of rapping losses to improve ESP performance[C]//11th I.
  • 10森雄介,積田佳満,松本有夫,等.Operation results of IHI flue gas desulfurization system-unit No.1 (1 000 MW) of.

共引文献124

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部