摘要
针对大型热电联产基建工程施工工作的展开,要将质量管理及时落实到其中。通过质量管理工作,能够及时发现在工程建设施工中存在的质量问题,并给出调整措施,保证各环节施工质量符合标准。在实际质量管理中,要加强施工阶段以及工程项目竣工阶段质量控制工作,提升整体工程项目质量。
In view of the construction work of large-scale co-generation of heat and power infrastructure project,quality management should be implemented in a timely manner.Through the quality management work,the quality problems existing in the project construction can be found in time,and the adjustment measures are given to ensure that the construction quality of each link conforms to the standard.In the actual quality management,we should strengthen the quality control in the construction stage and the completion stage of the project to improve the overall quality of the project.
出处
《科技创新与应用》
2021年第11期94-96,共3页
Technology Innovation and Application
关键词
大型热电联产
基建工程
质量管理
large-scale co-generation
infrastructure project
quality management