期刊文献+

平陆运河船闸通过能力研究 被引量:5

Lock capacity of the Pinglu Canal
下载PDF
导出
摘要 船闸通过能力是平陆运河开发的核心问题之一。基于货运量和过闸船型预测结果,分析影响船闸通过能力的因素;采用计算机模拟技术,建立船舶进闸的排队仿真模型,得出一次过闸平均吨位、一次过闸船舶数及闸室利用率3个关键参数,据此分析并比较合理尺度下大、小船闸分工运行和双线船闸随机运行两种模式的船闸通过能力;并在大、小船闸分工运行模式下,对小闸通过能力与船舶载货量进行闭合调整。结果表明,平陆运河须同时建设双线船闸,当1000吨级船舶艘次比较大时,大、小船闸分工运行模式的船闸通过能力更大,且远期部分1000吨级船舶须从大闸通过才能使小闸通过能力满足运输需求。 The lock capacity is one of the core concerns for the Pinglu Canal.This paper analyzes the factors influencing the lock capacity.Through computer simulation,three main indicators,i.e.the average total tonnages per lockage,the average vessel number per lockage,and the occupancy rate of the lock chamber,are acquired,and according to which,the lock capacities of the two operation modes including separate operation of large and small locks with a reasonable scale and random operation of the double-lane lock are compared.Moreover,the lock capacity and ship s freight tonnage under the separate operation mode are adjusted.The result shows that double-lane locks shall be built at the same time,the separate mode provides a bigger capacity when the 1000 DWT vessel accounts for a larger proportion,and some 1000 DWT vessels have to pass through the big lock to ensure that the small lock s capacity meets the transport demand.
作者 穆森 吕小龙 MU Sen;LYU Xiao-long(CCCC Water Transport Co.,Ltd.,Beijing 100007,China)
出处 《水运工程》 北大核心 2021年第3期145-150,共6页 Port & Waterway Engineering
关键词 平陆运河 船闸 计算机仿真 船闸通过能力 the Pinglu Canal lock computer simulation lock capacity
  • 相关文献

参考文献6

二级参考文献24

  • 1交通部规划研究院.长洲枢纽通航建筑物建设规模研究[R].北京:交通部规划研究院,2008.
  • 2黄东莹,黄棉婧.长洲水利枢纽三四线船闸工程开工贵梧航道通航仪式.(2009-12-29)[2010-01-04][EB/OL]http://www.wzljl_cn/content/2009-12/29/content_17967_2.htm.
  • 3广西电力工业勘察设计研究院.长洲水利枢纽工程可行性研究阶段1×1000t+1×2000t船闸规模扩大专题报告[R].南宁:广西南力工业勘察设计研究院,2005.
  • 4梁应辰.葛洲坝水利枢纽通航建筑物设计及其主要经验和教训[G]//梁应辰.长江三峡、葛洲坝水利枢纽通航建筑物总体布置研究.北京:人民交通出版社,2003.
  • 5莫伟弘,周瑛,张珊,等.长洲水利枢纽三线四线船闸工程初步设计成果[R].南宁:广西电力工业勘察设计研究院,2010.
  • 6Brent D Bandy. Fox river locks SI,AM simulation model[C], Winter Simulation Conference. 1988:815-820.
  • 7Brent D Bandy. Simulation of for river locks boat lift[C]. Winter Simulation Conference 1991 : 802-808.
  • 8Brenl D Bandy. Simulation of the Illinois wterway locksystem[C].California Winter Simulation Conference. 1996: 1 483-1 487.
  • 9Smith I, Douglas, Sweeney H Donald C. Campbell Janes F. A simulation model to evaluate decisiun rules for lock operations on the upper Mississippi River[C]. Hawaii: Proceedings of the 40th Hawaii International Conference on System Sciences, 2007:1 530-1 605.
  • 10Ting Ching Jung, Sehonfeld Paul. Efficiency versus fairnese in priority control: Waterway lock case[J].Ournal of Waterway, Port, Coastal, and Ocean call Engineering, 2001(2): 82-88.

共引文献29

同被引文献27

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部