摘要
本文根据马銮湾水生态修复湿地工程的前期方案成果,对项目方案策划过程中的思路进行了梳理,对湿地进水水质、水量、水动力和现状地形地貌等条件进行了分析,对策划过程中主要影响方案的因素及原则进行了介绍,并介绍了人工湿地的基本原理、常见类型、主要影响净化效果的因素及常见问题等。
Based on the preliminary scheme results of the water ecological restoration wetland project in Maluan Bay, this paper combs the ideas in the process of project scheme planning, analyzes the influent water quality, water quantity, hydrodynamic force, current topography and other conditions of the wetland, and introduces the main factors and principles affecting the scheme in the planning process. The basic principle, common types, main influencing factors and common problems of constructed wetland were introduced.
作者
钟海峰
Zhong Haifeng(Xiamen Special Service Real Estate Co.,Ltd.,Xiamen Fujian 361000,China)
出处
《城市建筑》
2020年第36期181-183,共3页
Urbanism and Architecture
关键词
人工湿地
方案
经验总结
常见问题
artificial wetland
scheme
experience summary
common problems