期刊文献+

探讨人工湿地方案推进管理工作经验——以马銮湾水生态修复湿地工程为例 被引量:3

Discussion on the Management Experience of Wetland Scheme Design——A Case of the Water Ecological Restoration Wetland Project in Maluan Bay
下载PDF
导出
摘要 本文根据马銮湾水生态修复湿地工程的前期方案成果,对项目方案策划过程中的思路进行了梳理,对湿地进水水质、水量、水动力和现状地形地貌等条件进行了分析,对策划过程中主要影响方案的因素及原则进行了介绍,并介绍了人工湿地的基本原理、常见类型、主要影响净化效果的因素及常见问题等。 Based on the preliminary scheme results of the water ecological restoration wetland project in Maluan Bay, this paper combs the ideas in the process of project scheme planning, analyzes the influent water quality, water quantity, hydrodynamic force, current topography and other conditions of the wetland, and introduces the main factors and principles affecting the scheme in the planning process. The basic principle, common types, main influencing factors and common problems of constructed wetland were introduced.
作者 钟海峰 Zhong Haifeng(Xiamen Special Service Real Estate Co.,Ltd.,Xiamen Fujian 361000,China)
出处 《城市建筑》 2020年第36期181-183,共3页 Urbanism and Architecture
关键词 人工湿地 方案 经验总结 常见问题 artificial wetland scheme experience summary common problems
  • 相关文献

参考文献5

二级参考文献55

共引文献38

同被引文献44

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部