摘要 山西垣曲抽水蓄能电站装机4×300 MW,额定水头457 m,在系统中承担调峰、填谷、储能、调频、调相和紧急事故备用等任务,保证电网的安全、稳定、经济运行。文章对该抽水蓄能电站输水系统的工程地质条件、输水系统布置以及进/出水口、引水调压室、尾水调压室、压力管道钢衬段及其排水设计做了介绍,可为类似工程设计提供参考。 Shanxi Yuanqu pumped storage power station has an installed capacity of 4×300 MW and a rated water head of 457 m.In the system,it undertakes the tasks of peak and valley filling,energy storage,frequency and phase modulation and emergency standby to ensure the safe,stable and economic operation of the power grid.The paper introduces the engineering geological conditions,the layout of the water transmission system,the inlet/outlet,the diversion surge chamber,the tailwater surge chamber,the steel lining section of the pressure pipeline and its drainage design of the pumped storage power station,which can provide reference for the similar engineering design.
作者 王杨 苏奕康 张子奇 王哲 张腾 WANG Yang;SU Yi-kang;ZHANG Zi-qi;WANG Zhe;ZHANG Teng
出处 《东北水利水电》 2021年第3期3-4,16,71,共4页 Water Resources & Hydropower of Northeast China
关键词 抽水蓄能电站 输水系统 进/出水口 调压室 压力管道 pumped storage power station water transmission system inlet/outlet surge chamber pressure pipeline
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部