摘要
分析并介绍了衢州体育公园“三馆”的空调冷热源系统设计。在满足体育建筑赛时正常运行和赛后经济运行的同时,力求与建筑方案的完美配合。
The design of cooling and heating source system of Quzhou sports park is analyzed and introduced.In order to meet the normal operation of the sports construction competition and the economic operation after the competition,the perfect coordination with the construction scheme is made.