摘要
以主题乐园项目和国内工业项目的建筑信息模型(BIM)正向设计经验为基础,从建设工程建筑电气专业设计角度出发,介绍了现阶段进行BIM正向设计的基本流程、规则方法和技巧,其既能满足设计审查深度,又能在设计阶段解决碰撞,可为电气设计人员提供参考。
Based on the experience of building information modeling(BIM)forward design on some theme park projects and domestic industrial projects,from the perspective of construction electrical design of building,this paper introduced the basic process,rules,methods and techniques for BIM forward design,which can not only satisfy the requirement of governmental review,but also solve the collisions in the design stage.It can provide references for electrical designers.
作者
马亚雄
高磊
刘康发
MA Yaxiong;GAO Lei;LIU Kangfa(China Haisum Engineering Co.,Ltd.,Shanghai 200031,China;Jiangsu Sheng Tang He Zhi Architectural Design Co.,Ltd.,Changzhou 213000,China)
出处
《现代建筑电气》
2021年第2期5-8,共4页
Modern Architecture Electric
关键词
BIM正向设计
Revit软件
可视化设计
三维视图
building information modeling(BIM)forward design
Revit software
visualization design
three dimension view