期刊文献+

基于BIM的道路地质地面信息模型构建及应用 被引量:11

Construction and Application of Geological Ground Information Modeling for Road Based on BIM
原文传递
导出
摘要 基于BIM的道路全数字三维地质地面信息模型构建是实现道路工程BIM动态设计的关键。以北京市平谷区黄松峪山区某道路工程为例,将道路地质地面信息导入到Civil 3D中,利用Civil 3D的点、块、曲面、实体提取等功能,构建了三维地质地面信息基础模型并在此基础之上进行综合设计,实现了基于地质地面信息的纵断面设计、土石方计算等定量分析。结果表明,该方法可以初步解决道路设计中地质地面信息储存、管理、分析以及可视化的问题,为基于BIM的道路全数字化正向设计提供支撑。 The digital 3 Dgeological ground information modelling based on BIM is the key to realize the dynamic design of BIM for road engineering.In this paper a road project in Huangsongyu mountainous area of Beijing Pinggu District is taken as an example.The geological and ground information are bring into civil 3 D,the point,block,surface,solid extraction and other functions of civil 3 Dare used to build a basic3 Dgeological ground information modeling and comprehensive road design based on the model.The quantitative analysis of vertical section design and earthwork calculation are realized based on the modeling.The results show that this method can solve the problems of geological ground information storage,management,analysis and visualization in road design,and support full digital forward design of road based on BIM.
作者 张志清 金雪峰 肖书影 张贵阳 ZHANG Zhi-qing;JIN Xue-feng;XIAO Shu-ying;ZHANG Gui-yang(Beijing Key Laboratory of Traffic Engineering,College of Metropolitan Transportation,Beijing University of Technology,Beijing 100124,China)
出处 《公路》 北大核心 2021年第2期28-34,共7页 Highway
基金 国家自然科学基金项目,项目编号51578027。
关键词 道路工程 BIM 三维地质地面建模 道路设计 信息化 highway engineering BIM 3Dgeological and ground modeling road design informatization
  • 相关文献

参考文献4

二级参考文献18

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2胡振中,路新瀛,张建平.基于建筑信息模型的桥梁工程全寿命期管理应用框架[J].公路交通科技,2010,27(S1):20-24. 被引量:43
  • 3满庆鹏,孙成双.基于IFC标准的建筑施工信息模型[J].土木工程学报,2011,44(S1):239-243. 被引量:43
  • 4朱良峰,潘信,吴信才.三维地质建模及可视化系统的设计与开发[J].岩土力学,2006,27(5):828-832. 被引量:131
  • 5National Institute of Building Sciences. United states national building information modeling standard version 1 - Part 1: overview, principles and methodologies [ R/OL]. [ 2011-9-10]. http://www. wbdg. org/pdfs/ NBIMSv1 _p1. pdf.
  • 6Eastman C, Teicholz P, Sacks R, et al. BIM handbook 2th edition[ M]. New Jersey: John Wiley & Sons, Inc. , 2010.
  • 7Mekinney K, Kim J, Fischer M, ct al. Interactive 4D-CAD [ C ]// Proceeding of the Third Congress in Computing in Civil Engineering. Anaheim : ASCE, 1996:383-389.
  • 8Kim C, Kim H, Park T, et al. Applicability of 4D CAD in civil engineering construction: case study of a cable-stayed bridge project[ J]. Journal of Computing in Civil Engineering, 2011, 25 (1) : 98-107.
  • 9Zanen P P A, Hartmann T, AI-Jibouri S H S, et al. Using 4D CAD to visualize the impacts of highway construction on the public [J]. Automation in Construction, 2013, 32(1): 136-144.
  • 10Zhang J P, Hu Z Z. BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. principles and methodologies [J]. Automation in Construction, 2011, 20(2): 155-166.

共引文献158

同被引文献114

引证文献11

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部