摘要
随着城市化进程的不断深化,公路桥梁施工项目与铁路施工存在交叉的情况随之增多,为保障城市道路交通与铁路交通均安全通行,需要在公路桥跨铁路施工中运用转体施工技术确保工程质量。基于此,论文阐述了大跨度公路桥跨铁路施工转体设备构成,并结合实际案例展开大跨度公路桥跨铁路具体施工技术探讨,旨在通过加强技术探讨,确保大跨度公路桥施工与跨铁路施工质量。
With the deepening of urbanization,there are more intersections between highway bridge construction projects and railway construction.In order to ensure the safe passage of urban road traffic and railway traffic,it is necessary to apply swivel construction technology in highway bridge across railway construction to ensure the engineering quality.Based on this,this paper expounds the composition of the swivel equipment for the construction of long-span highway bridge across railway,and discusses the concrete construction technology of long-span highway bridge across railway in combination with practical cases,aiming at ensuring the quality of long-span highway bridge construction and cross-railway construction by strengthening the technical discussion.
作者
蒙军
MEGN Jun(China Railway 16th Bureau Group Co.Ltd.,Beijing 100018,China)
出处
《工程建设与设计》
2021年第4期195-196,199,共3页
Construction & Design for Engineering
关键词
大跨度
公路桥跨铁路
施工技术
large span
highway bridge across the railway
construction technique