转化炉汽包上升管道的优化设计

Optimal Design of Drum Rising Pipe of Reformer
下载PDF
导出
摘要 介绍了某制氢装置转化炉汽包上升蒸汽管道的平面布置。使用了管道设计软件PDMS进行了管道规划。并用应力分析软件CAESARII对转化炉汽包上升管系的设计方案进行了计算并优化。比较了两种管道布置方案,对设计中所遇到的问题进行了探讨,为今后类似装置的设计提供参考。 In this paper,the design scheme of the drum rising pipe of the reformer in a hydrogen production unit is compared.The pipeline design software PDMS was used for the pipeline planning.The calculation and optimization of the upward piping system of the converter drum were carried out by using the stress analysis software CAESARII and two kinds of pipeline layout schemes are compared.The problems encountered in the design are discussed in this paper,which can provide reference for the design of similar devices in the future.
作者 孟石 苏创 MENG Shi;SU Chuang(Petrochemical School,Lanzhou Petrochemical Polytechnic,Lanzhou 730060,China;Applied Chemistry School,Lanzhou Petrochemical Polytechnic,Lanzhou 730060,China)
出处 《兰州石化职业技术学院学报》 2020年第4期6-8,共3页 Journal of Lanzhou Petrochemical Polytechnic
关键词 制氢装置 转化炉 汽包上升管 管道设计 管道应力分析 hydrogen plant steam reformer furnace drum rise pipe piping design piping stress analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部