摘要
基于生活垃圾处理方法中的水泥窑协同处理生活垃圾项目,由于项目供水水源条件的变化,需要对给水系统进行改造从而满足水泥窑协同处理生活垃圾项目的正常运行,根据项目改造前给水系统现状描述和介绍、变更后的水源条件和原因,提出消火栓系统、生产和生活给水系统、冷却水系统的改造具体方案并加以对比分析,最终选择最适宜本项目的改造方案,并进行给水工程改造主要内容的设计和要点分析,为项目初期和运行后成本降低打下基础。
Based on the cooperative treatment project of cement kiln in the treatment method of domestic waste,because of the change of water supply source conditions in the project,it is necessary to reform the water supply system to meet the normal operation of the project.According to the description and introduction of the current situation of the water supply system before the transformation of the project and the water source conditions and reasons after the change,the specific transformation schemes of fire hydrant system,production and domestic water supply system and cooling water system were put forward and analyzed.Finally,the most suitable transformation scheme for this project was selected and the design and key point analysis of the main content in water supply engineering transformation were carried out.This study could lay the foundation for cost reduction at the initial stage and after operation of the project.
作者
杨晶博
YANG Jingbo(China Urban Construction Design&Research Institute Co.,LTD,Beijing 100120,China)
出处
《北京水务》
2021年第1期67-70,共4页
Beijing Water
基金
中国建设科技集团科技创新基金项目(Z2016J09):新型干法水泥窑协同处置生活垃圾工程方案研究。
关键词
给水
消防
冷却水
改造
water supply
fire control
cooling water
transformation