期刊文献+

斯里兰卡燃煤电站购电协议(PPA)电价规则的解析

Analysis of General Power Purchase Agreement for Power Sector Project in Sri Lanka
原文传递
导出
摘要 中国企业投资建设海外电厂时,购电协议(PPA)是谈判中非常重要一部分,直接影响投资收益。以斯里兰卡电力市场燃煤电站通行的购电协议为例,着重分析其核心条款电价定价的设计机制,阐述双部制电价的计算方法和影响因素,帮助深入理解"照付不议"的定价原则,可为国内发电集团投资建设海外特别是斯里兰卡燃煤电站提供参考。 When Chinese enterprises invest in overseas power plants, the power purchase agreement(PPA) is the most important agreement document required by the project financing for power plant project. Taking the PPA document dominating in Sri Lanka as an example, mechanism design of electricity tariff payment as the substantive term was analyzed. The calculation method and influential factors of Two-Part Tariff Mechanism for capacity payment and energy payment was described to better understand the principle of "Take or Pay", for the domestic power sector investing in overseas, especially in Sri Lanka.
作者 文新国 万茜 WEN Xin-guo;WAN Qian(China Machinery Engineering Corporation)
出处 《电站系统工程》 2021年第2期71-73,共3页 Power System Engineering
关键词 购电协议 双部制电价 照付不议 斯里兰卡 Power Purchase Agreement(PPA) two-part tariff mechanism take-or-pay Sri Lanka
  • 相关文献

参考文献4

二级参考文献16

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部