期刊文献+

自动化堆场混合堆存模式下双轨道吊协同调度策略与优化 被引量:2

Strategy for ARMG Coordinated Scheduling and Optimization under Hybrid Storage Mode of Automated Yard
下载PDF
导出
摘要 针对自动化堆场混合堆存模式下双轨道吊协同调度问题,进行了双轨道吊安全存取的无缝对接研究,通过分析它们在空间上的接力方式,以及时间上的接力顺序,提出在时空约束下交接点滚动变化的轨道吊交接策略;同时,构建双轨道吊协同调度模型,并将装卸效率和设备成本作为目标函数,然后运用遗传算法求解。通过比较分析四种调度策略,设置不同规模试验,证明接点影响船舶和堆场的装卸效率,但对设备成本影响不大,而双轨道吊协同调度会提高船舶装卸效率,为港口运营管理提供了一些参考。 In this paper,in light of the problems in the coordinated scheduling of ARMG under the hybrid storage mode of automated yards,we studied the seamless joining for the safe access of the ARMG.Next,by analyzing their means of relay both in space and in sequence,we proposed the ARMG switch strategy with rolling change at the joint point under both the spatial and temporal constraints.At the same time,we set up an ARMG coordinated scheduling model,and with the loading and unloading efficiency and equipment cost as the objective function,used the genetic algorithm to solve the model.Through comparing the four scheduling strategies and experimenting at different scales,it was proved that the joint point would affect the loading and unloading efficiency of the ships and yards,but had little effect on equipment costs;while the ARMG scheduling would improve the loading and unloading efficiency of the ships.
作者 蒋敏敏 添玉 黄渭 范勤勤 JIANG Minmin;TIAN Yu;HUANG Wei;FAN Qinqin(Business College,Nanfang college of Sun Yat-sen University,Guangzhou 510970;Logistics Engineering College,Shanghai Maritime University,Shanghai 201306,China)
出处 《物流技术》 2021年第3期122-127,共6页 Logistics Technology
基金 上海市教育科学研究一般项目(C2021072) 国家自然科学基金项目(61603244) 中国博士后科学基金面上项目(2018m642017)。
关键词 自动化堆场 混合堆存 双轨道吊 协同调度 遗传算法 automated storage yard hybrid storage ARMG coordinated scheduling genetic algorithm
  • 相关文献

参考文献6

二级参考文献63

  • 1XIN J, NEGENBORN R R, LODEWIJLCS G. Energy-aware control for automated container terminals using integrated flow shop schedu- ling and optimal control [ J]. Transportation Research Part C, 2014, 44(6) : 214 -231.
  • 2VIS I F A, CARLO H J. Sequencing two cooperating automated stacking cranes in a container terminal [ J]. Transportation Science, 2010,44(2) : 169 - 181.
  • 3PARK T, CHOE R, OK S M. Real-time scheduling for twin RMGs in an automated container yard [J]. OR Spectrum, 2010, 32(4): 593 - 615.
  • 4DORNDORF U, SCHNEIDER F. Scheduling automated triple cross- over stacking cranes in a container yard [ J]. OR Spectrum, 2010, 32(6) : 617 -633.
  • 5KEMME N. Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals [ J]. OR Spectrum, 2012, 34(2) : 563 - 591.
  • 6ZHANG C, WAN Y, LIU J, et al. Dynamic crane deployment in container storage yards [ J]. Transportation Research Part B, 2002, 36(5) : 537 -555.
  • 7HE J, CHANG D, MI W, et al. A hybrid parallel genetic algorithm for yard crane scheduling [ J]. Transportation Research Part E, 2010,46(8) : 136 - 155.
  • 8NG W C. Crane scheduling in container yards with inter-crane inter- ference [ J]. European Journal of Operational Research, 2005, 164 (3) :64 -78.
  • 9BIAN Z, JIN Z-H. Optimization on retrieving containers based on multi-phase hybrid dynamic programming [ J]. Procedia-Social and Behavioral Sciences, 2013,96(3) : 844 -855.
  • 10PETERING M E H, MURTY K G. Effect of block length and yard crane deployment systems on overall performance at a seaport con- tainer transshipment terminal [ J]. Computers and Operations Re- search, 2009, 36(1) : 1711 - 1725.

共引文献40

同被引文献9

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部