摘要
国内炼油项目的开工试运行模式为EPC加炼油企业主合作模式,该模式在国外EPCC项目中有应对不足的问题。通过整理和总结某海外EPCC炼油项目装置开工过程中仪表专业所做的准备工作,包括文件资料、开工备品备件、仪表开工团队组织等,希望能为国内石化工程公司、设计院实施的海外EPCC炼油项目开工试运工作提供有用的参考。
Startup and commissioning mode of domestic refinery project consists of EPC and refinery enterprise owners cooperation,the mode is insufficient in oversea EPCC project.Through summarizing and concluding the preparation works of instrument major for the startup and commissioning process in one oil oversea refinery EPCC project,including the preparations of documents,spare parts,and team organization for the instrument startup,and so on,it hopes to provide a useful reference for the domestic petrochemical engineering companies and designing institutes when implementing the startup and commissioning work in the overseas refinery EPCC project.
作者
陈怡
庞喆龙
袁振东
Chen Yi;Pang Zhelong;Yuan Zhendong(Sinopec Luoyang Engineering Co.Ltd.,Luoyang,471003,China;Sinopec Guangzhou Engineering Co.Ltd.,Guangzhou,510620,China;Luoyang Sanlong Construction and Overhaul Co.Ltd.,Luoyang,471003,China)
出处
《石油化工自动化》
CAS
2021年第2期52-55,95,共5页
Automation in Petro-chemical Industry
关键词
仪表专业
设计
开工试运
EPCC海外炼油项目
instrumentation major
design
startup and commissioning
oversea refinery EPCC project