梅山铁矿通风系统多时段变频分风方法应用 被引量:1

Application of Multi-period Variable Frequency Air Distribution Method in Ventilation System of Meishan Iron Mine
下载PDF
导出
摘要 梅山铁矿通风系统15台主通风机总装机容量为2 730 kW,全天满负荷运行实耗功率为1 940.76 kW,机学和流体力学理论中频率、转速和风量之间的关系式,精确计算出满足3个时段矿井需风量时各主通风机的实际运行频率,然后通过远程控制系统对各主通风机进行精确调频,按需通风。系统运行正常后实际风量能够满足3个时段所需风量的要求,各时段实耗功率分别为1 093.28 kW、1 385.06 kW和1 786.38 kW,15台主通风机每年可节省通风成本386.59万元,解决了主通风机满负荷运行造成的风量和能耗浪费等问题。 Meishan iron mine adopts the ventilation system of four-stage progressive return fan station,with many main fans and wide distribution.In order to strengthen the management of ventilation system,the remote control system of multi-stage fan station of the mine was gradually established in 2006.Main fans are equipped with frequency converter,total installed capacity of 15 main fans is 2730 kW,actual power consumption of fulltime operation is 1940.76 kW,and the annual ventilation cost is up to 14.4509 million Yuan.If the ventilation of working faces with constant air volume according to the maximum demand,it shall be inevitably result in the waste of air volume and energy consumption.At present,changing the characteristic curves of the main fans to adjust the air volume can be achieved by adjusting the installation angle of the blade or the frequency conversion of 1 Hz amplitude,but this method is time-consuming,laborious and difficult,and the method of precise frequency modulation to adjust the air volume is relatively weak.Therefore,based on the theory of"balance of supply and demand",ventilation period is divided into three,according to the number of mining face,driving working face,other working faces and chambers,and given a certain air leakage coefficient to determine the actual air volume in three periods for ventilation on demand,which can maximize the effect of ventilation and energy saving.According to the relationship between frequency,rotation speed and air volume in the theory of electromotor and fluid mechanics,the actual operating frequency of each main fan meeting the mine air demand in three periods was calculated accurately.Each main fan is precisely and remotely frequency modulated by PLC remote control system,which simplifies the complicated regulation mode of ventilation management personnel adjusting air volume by frequency 1 Hz.After normal operation,the actual air volume in three periods can meet the requirements,and the actual power consumption in each period is 1093.28 kW,1385.06 kW and 1786.38 kW.Through the implementation of research plan of multi time precise frequency conversion and energy saving ventilation technology,the ventilation cost of mine ventilation system is saved by 3.865 million Yuan per year,which solves the problems of air volume,energy consumption and waste caused by full ventilation of the mine ventilation system.The effect is remarkable,which embodies the advanced nature of modern mine ventilation and energy saving technology,and fully displays the advantages of multi-stage time station frequency conversion ventilation"intelligent"energy saving.
作者 许志逞 居伟伟 XU Zhicheng;JU Weiwei(Nanjing Baodi Meishan Production City Development Co.,Ltd.,Mining Branch,Nanjing 210012,Jiangsu,China;Sinosteel Ma’anshan Institute of Mining Research Co.,Ltd.,Ma’anshan 243000,Anhui,China;State Key Laboratory of Safety and Health for Metal Mine,Ma’anshan 243000,Anhui,China;Huawei National Engineering Research Center Co.,Ltd.,of High Efficiency Cyclic Utilization of Metal Mineral Resources,Ma’anshan 243000,Anhui,China)
出处 《黄金科学技术》 CSCD 2021年第1期129-135,共7页 Gold Science and Technology
基金 “十三五”国家重点研发计划项目“金属非金属矿山采运过程物理化学除尘技术与装备”(编号:2017YFC0805204) 安徽省科技重大专项项目“工业企业低浓度VOC废气净化设备与技术研究”(编号:17030801034)联合资助。
关键词 多时段 多风机 通风系统 按需通风 精确变频 实耗功率 通风节能 multi-period multi-fan ventilation system ventilation on demand precise frequency conversion actual power consumption ventilation and energy saving