摘要 以长沙市某道路改造工程为例,根据工程地质条件、周边环境以及道路改造方案等情况,分析了现状排水管道废除的原因,提出了现状排水管道废除常见的4种施工方案——放坡开挖废除、钢板桩支护开挖废除、非开挖灌砂废除、非开挖注浆废除。结合本项目特点,为避免管道开挖对道路质量的影响及节约工程造价的原则,最终确定本项目现状排水管道的废除采用非开挖注浆废除方案。此方案的成功应用可为今后现状排水管道的非开挖废除提供范例。 This paper takes a road renovation project in Changsha city as an example.According to the geological conditions,the surrounding environment and the road improvement scheme,etc.,the reasons for the abolition of the current drainage pipeline are analyzed.Four common construction schemes for abolishing the current drainage pipeline are proposed,including slope excavation abolishing,steel sheet pile construction abolishing,non excavation sand filling abolishing and non excavation grouting abolishing.Combined with the characteristics of this project,the principle of pipeline excavation did not affect the road quality and project cost saving are considered.Finally,the abolition of the current drainage pipeline of this project determined to adopt non excavation grouting abolishing method.Its successful application can provide a guideline for the non excavation abolition of the current drainage pipeline in the future.
作者 陈华柏 肖拾红 黄利勇 CHEN Hua-bai;XIAO Shi-hong;HUANG Li-yong(Zhongrong Planning and Design Co.Ltd.,Changsha 410219,China)
出处 《工程建设与设计》 2021年第5期67-68,73,共3页 Construction & Design for Engineering
关键词 排水管道 非开挖 开挖 废除 drainage pipeline non-excavation excavation abolition
  • 相关文献

参考文献3

二级参考文献11

共引文献11

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部