摘要
本文通过对保安泵站跨汛期施工发生的度汛险情进行调查了解并分析险情发生的原因,探讨就如何做好在建穿堤泵站跨汛期施工度汛安全工作,提出了改进建议,旨在为类似工程提供参考,避免度汛险情发生。
Based on the investigation and analysis of the situation occurred in the construction of the Bao’an Pumping Station during the flood season,this paper discusses how to ensure the construction safety of pumping station across the flood season,and puts forward suggestions for improvement,so as to provide reference for similar projects to avoid the occurrence of flood situation.
出处
《吉林水利》
2021年第3期59-62,共4页
Jilin Water Resources
关键词
在建
泵站
跨汛期
度汛安全
during construction
pumping station
cross flood season
flood safety