期刊文献+

PDCA循环在公路桥梁施工质量管理中的实践应用 被引量:1

Application of PDCA Cycle in Quality Management of Highway and Bridge Construction
下载PDF
导出
摘要 PDCA循环是一种时间性极广泛的管理手段,将PDCA循环应用到路桥建设项目的各个环节中,能够通过各个环节之间的相互联系,层层递进,在施工过程及时发现存在的问题并及时改进,有利于公路桥梁施工项目的质量管理的严格管控。基于此,本文对PDCA循环在公路桥梁施工质量管理中的实践应用展开了相应的讨论,希望能够给公路桥梁施工人员的日后工作提供参考。 PDCA cycle is a kind of time-extensive management method.It can be applied to every link of highway and bridge construction projects to identify the quality issues of construction projects can be identified and make improvements in a timely manner through the mutual and progressive relations between links,which is is conducive to the strict control of the quality management of highway and bridge construction projects.On this basis,this paper discusses the application of PDCA cycle in highway and bridge construction quality management,hoping to provide reference for highway and bridge construction workers in the future.
作者 王振 胡朋 Wang Zhen;Hu Peng(Highway Development Center of Jiangsu Provincial Transportation Department,Nanjing Jiangsu 210004,China;ShanDong JiaoTong University,Jinan Shandong 250357,China)
出处 《城市建筑》 2021年第5期143-145,共3页 Urbanism and Architecture
基金 山东省自然科学基金项目(ZR2017LEE026)。
关键词 PDCA循环 公路桥梁施工 质量管理 实践应用 PDCA cycle highway and bridge construction quality management practical application
  • 相关文献

参考文献3

二级参考文献15

共引文献15

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部