摘要
以广元市081产业新城1号安置点安置还房工程为依托,通过开展事故调查,对地下室抗水板上浮原因进行分析,并对抗水板抗浮与加固措施进行研究。合理利用场地地形条件,通过自然找坡增设盲沟,将基底汇水引排至场外,既经济合理,又绿色环保,且具有一定社会效益。
Based on the project concerning the resettlement and restoration of the site No 1 in the Industrial New Town 081 in Guangyuan,through the investigation of the accident,this paper analyzes the reasons of floating for the basement water-resistant boards,and studies the anti-floatation and reinforcement measures for the water-resistant boards.Through the rational use of the terrain conditions of the site,the french drain is added to the natural slope,and the basement catchment water is drained to the outside.This method is economical and reasonable,and environmentally friendly,which has certain social benefits.
作者
李泽泽
张炳焜
LI Zeze;ZHANG Bingkun(Sichuan Insitute of Building Research Co.,Ltd.,Chengdu,Sichuan 610081,China)
出处
《施工技术》
CAS
2021年第3期40-42,共3页
Construction Technology
基金
四川省科技厅项目(2017JZ0035)
华西集团课题(HXKX2017/018)。
关键词
地下室
抗水板
抗浮
加固
截排水
basement
water-resistant boards
anti-floatation
reinforcement
water interception and drainage